R/C Shuttle page 2
Painted and almost ready to fly.  Without the
receiver and battery back the orbiter weighs 5.5
oz. 9/24/02
Shuttle full stack construction         
10/18/02
The SRB's are constructed from 2 inch mailing tubes, poster
board, fiberglass and plywood.  I plan to add some paint in
the next few days.  These two SRB's will not hold any
propellant and will be permanently attached to the external
tank.
External Tank construction.      10/25/02
To Page 3